Dear All,

 

Today was our pre season clean up day at the club and for the second year running the turn out was very dissapointing. I understand that some people would be away or have other commitments and i did recieve a few apologies beforehand, which i am grateful for. However, i feel a little let down that people are not prepaired to come together and put in a little effort to make our club better.

 

Thanks to the people who did come down, Paul Burgess, Joe burgess, Steve Battams, Paul McCarthy, Sue Thorne, Simon Munns and Dave Baker. Lots of jobs were completed, which is great.

 

 

All is not lost though. There is a list by the bar in the club of jobs that still need doing, i expect there is something on that list for everyone capabilities. Please put your name to one and help out.

 

Thanks

 

Dan

Link to comment
Share on other sites

No probs Stewart. Most of the jobs can be done over the next few weeks anyway.

 

I should have said "free beer" for everyone, then bought a pint and put 30 straws in it :lol:

Link to comment
Share on other sites

Jobs around the pitch

Strim grass alongside the stands (petrol strimmer required)……………

Cut down nettles behind main stand ( bush strimmer required)…….

Re paint yellow hatched area’s ………………………………..Ed Shalor & Dan Butler TBA

Sweep down all terracing and pathways…………………..

Clean and sweep out turnstyle area…………………………………

Paint turnstyle doors………………………………………………..

Re fix loose wall bricks ……………………………………………… Simon Munns

Clean dug outs………………………………………………………….. Ben Murray & Steve Battams

Re fix dug outs Perspex where loose……………………….. Ben Murray & Steve Battams

Fix fence panel behind goal at Short Ln end………………

Fix Gate at pitchside toilet…………………………………………Simon Munns…DONE J

Clean pitchside toilets………………………………………………

Repair leaking pitch toilets pipes…………………………….. Dave Baker…….DONE J

Paint pitch toilet floor………………………………………………

Scrub Clean the goal posts …………………………………………Jamie Tilt ?

Weed kill edges off pitch…………………………………………..Ben Jacobs

 

Jobs around the Clubhouse

Clean ladies and gents toilets……………………………………Ladies, Jackie Poulter…DONE J… Gents…….

Paint toilet window sills inside and out……………………..

Sand and paint front window………………………………… Sanded.. Sue Thorne J

Paint guttering fascia………………………………………………….

Re varnish/stain patio benches and tables………………….

Weed kill along wall at entrance to club…………………….

Repair shower ceiling……………………………………….Dave Baker & Dan Butler….Done J

Repair extractor fans……………………………………..Keith Nash…part done

Fix internal door lock……………………………………………Simon Munns DONEJ

Paint over the green paint behind bar………………………..

Paint dressing room floors…………………………………………Dan Butler and Simon Munns...DONE

Wash down dressing room walls……………………………….. Dan Butler, Batts & Macca…….DONE

Deep clean Showers…………………………………………………. Iain Messenger…….DONE J

Clear kit cupboard …………………………………………………. Joe Burgess…..Done J

Replace dressing room whiteboard………………………Steve Battams & Macca….DONE J

Tea for the workers…………………………. Sue Thorne…DONE J J

Edited by fatboyatmfc
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...